欧美性交网_岛国无码一区二区三区_日韩精品色哟哟_欧美熟女色_在线日韩免费_免费看国产黄片_丝袜自慰喷水_久久午夜夜伦鲁鲁片_中文字幕成人网_久久久国产欧美_久久久久涩涩涩_国产精品伦一区二区三区_男人的天堂一区二区三区_欧美一性一交_欧美呦

NEWS

Analyzing the Jump detection steps of the piston rod

1. During one stroke of reciprocating piston movement, check the horizontal and vertical radial runout of products at all levels to check the comprehensive maintenance effect of the motion mechanism.
2. Measure the vertical runout: The dial is accurately installed at the top 12 o'clock position of the piston rod, close to the sealing packing, and the pointer on the dial should be perpendicular to the piston rod body. Measurement of vertical runout: The dial is set at the 3 or 9 o'clock position, in close contact with the packing, depending on the closest possible "close distance".
3. The connection between the plunger rod and the crosshead should be correctly opened, and the crosshead should be flat and evenly attached to the slide rail. The gap between the slider and the slide should not be 0.04 millimeters at 6 o'clock, and the gap between the four angle feeler gauges placed in the slide should be consistent.
4. Press and hold the "handle" on the dial, and the pointer on the dial will rotate on the surface of the dial, making the pointer face the zero mark on the dial surface.

| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |